Skip to main content
Commercial Deployment · Smart Infrastructure

Remote Control for Public Lighting

Central control, monitoring and fault reporting for connected street lights, their field controllers and the gateways between them.

Case Study

Project Overview

This platform links street-light controllers in the field, through gateways, to a central dashboard for control, monitoring and reporting. KoderTroop delivered it within a partner-led program for a public infrastructure operator. The architecture also suits controller manufacturers that need gateway software and a cloud platform built around their hardware.

System diagram for Smart Street Lighting Control Platform
How the system fits together, layer by layer.

The Business Problem

Lights spread across a wide area were hard to monitor, so faults and drifting schedules surfaced late and field maintenance stayed reactive.

What We Built

We integrated the controller hardware, device communications, cloud services and a web dashboard into one system. Authorized teams use it to review asset status, set schedules and investigate alerts.

The Outcome

Lighting is controlled remotely, field alerts feed maintenance planning, and every connected light, controller and gateway is visible to authorized teams on a single dashboard.

Inside the Platform

The main screens, walked through one capability at a time.

Schedules
Profiles follow local sunrise and sunset in each sector
Tonight7 daysNew profileOP
Tonight, noon to noonSunset and sunrise calculated per sector
Sector 1
Residential standard
Sector 2
Residential standard
Sector 3
Parks, off after midnight
Sector 4
Residential standard
Sector 5
Main road, full output
Sector 6Clock drift 9 min
Residential standard
12:0015:0018:0021:0000:0003:0006:0009:0012:00
100%70%50%OffNow, 21:40
Profile: Residential standardSectors 1, 2, 4, 6
StepTriggerOffsetLevel
1Sunset+0 min100%
2Fixed time 23:00—50%
3Fixed time 05:00—100%
4Sunrise+0 minOff
Lamp-on hours per night, Sector 1Next 14 days
15 Nov18 Nov21 Nov24 Nov28 Nov
Alarms
Faults isolated per light, routed by fault type
Asset IDOP
Open by fault type
Ballast failures5
Voltage spikes1
Cable power faults1 · 7 lights
Not reporting2
TodayOpenAll
TimeAssetFaultRouted toStatus
21:32SL-2-0114Voltage spike, 268 VElectrical crewNew
21:18SL-4-0230Cable fault, 7 lightsCable teamAssigned
20:51SL-1-0042Ballast failureLamp crewAssigned
20:47SL-1-0043Ballast failureLamp crewNew
19:05CTL-30871Controller not reportingNetwork opsNew
18:44SL-3-0119Voltage spike, 261 VElectrical crewCleared
18:12SL-5-0007Ballast failureLamp crewJob created
17:58SL-6-0151Ballast failureLamp crewJob created
16:40SL-6-0102Ballast failureLamp crewJob created
14:03GW-S6-02Gateway not reportingNetwork opsAssigned
09:26SL-2-0088Cable power faultCable teamCleared
SL-2-0114 · voltage spikeNew
LocationSector 2 · pole 114
ControllerCTL-20114
GatewayGW-S2-01
253 V
21:32Detected by controller
21:32Routed to electrical crew
—Waiting for acknowledgement
AcknowledgeCreate job
Routing rules
Voltage spike
Electrical crew
SMS and app
Ballast failure
Lamp crew
Next shift
Cable power fault
Cable team
Phone call
No contact, 30 min
Network ops
App
Gateways
Cellular backhaul · mesh to field controllers
Export listOP
Gateways7 of 8 online
GW-S1-01Sector 1 · 22 controllers
LTE-M
−84 dBm
GW-S2-01Sector 2 · 18 controllers
LTE-M
−91 dBm
GW-S3-01Sector 3 · 14 controllers
NB-IoT
−97 dBm
GW-S4-01Sector 4 south · 21 controllers
LTE-M
−88 dBm
GW-S4-02Sector 4 north · 16 controllers
LTE-M
−93 dBm
GW-S5-01Sector 5 · 12 controllers
NB-IoT
−106 dBm
GW-S6-01Sector 6 · 19 controllers
LTE-M
−86 dBm
GW-S6-02Sector 6 east · 11 controllers
LTE-M
Last seen 14:03
GW-S4-02 · meshOnline
C-0401C-0402C-0403C-0404C-0405C-0406C-0407C-0408C-0411C-0412C-0413C-0414C-0415C-0416C-0417C-0418GW-S4-02Good linkFair linkLost
UplinkLast check-in 12 s ago
BackhaulLTE-M
Signal−93 dBm
Controllers15 of 16
Max hops3
Queued0 messages
Signal, dBm · last 24 hWeak below −10522:0004:0010:0016:0021:40
Asset map
Sector 4 and neighbours · 100 lights · schedule running
Pole, controller or gatewayOP
Sector 4SL-4-0218GW-S4-02GW-S3-01
SL-4-0218On · 70%
Sector 4 · pole 218 · controller CTL-40218
Power48 W
Supply231 V
Current0.21 A
Burn hours14,212 h
GatewayGW-S4-02 · mesh, 2 hops
Manual override
Off50%70%100%
Until
Next sunrise, 06:04
Apply to lightApply to sector
On72Dimmed19Fault5No contact4
Maintenance
Jobs created from field alerts · week of 10 Nov
BoardCrew calendarNew jobOP
5 alerts from tonight have no job yet. Two are urgent.Create jobs for all
From alerts5
SL-2-0114Urgent
Voltage spike, 268 V
Sector 2 · raised 21:32Unassigned
SL-4-0230Urgent
Cable power fault, 7 lights
Sector 4 · raised 21:18Unassigned
SL-1-0042
Ballast failure
Sector 1 · raised 20:51Unassigned
SL-1-0043
Ballast failure
Sector 1 · raised 20:47Unassigned
CTL-30871
Controller not reporting
Sector 3 · raised 19:05Unassigned
Scheduled4
SL-5-0007
Ballast failure
Sector 5 · Sat 15 NovJT
SL-6-0151
Ballast failure
Sector 6 · Sat 15 NovJT
SL-6-0102
Ballast failure
Sector 6 · Sat 15 NovJT
GW-S6-02
Gateway not reporting
Sector 6 · Mon 17 NovLF
In progress2
SL-3-0064On site
Replace lamp driver
Sector 3 · on site 20:10HK
SL-2-0088On site
Cable joint repair
Sector 2 · started 19:30BN
Done today3
SL-4-0197Verified
Ballast replaced
Sector 4 · closed 17:45HK
SL-1-0019Verified
Lamp replaced
Sector 1 · closed 15:20JT
SL-5-0031Verified
Controller reset
Sector 5 · closed 11:05LF

Dimming and lighting profiles follow local sunrise and sunset times in each sector.

Technology5 Technologies

Technologies & Delivery Models

Select Category1 Categories
Next Step

Planning a Comparable System?

Tell us about the device, the sites and the systems it has to connect to. A senior specialist will work through the architecture with you.